SengKang Hospital - Facility Resource Center
At the begining, FRC was using tables as work desk.
Wires running all over the floor and desk making it displeasing and inconducive environment to work.
A promised console was long overdue ...
-
SengKang Hospital - Facility Resource Center
Workstations were placed on the table top, leaving no space for writing.
Some monitors were stacked on top of tower CPU, making it very uncomfortable working posture.
-
SengKang Hospital - Facility Resource Center
Wires running all over the floor and desk making it displeasing and inconducive environment to work.
-
SengKang Hospital - Facility Resource Center
Maintenance and troubleshooting when equipments break down was quite a challenging work.
-
SengKang Hospital - Facility Resource Center
Cablings may get damaged by operators working at the desk.
-
SengKang Hospital - Facility Resource Center
A promised console was long overdue ...
-
SKH FRC - The Makeover
A migration plan was meticulously drafted for FRC makeover
-
SKH FRC - The Makeover
Numerous plans and design were drafted and countless drawing submitted ...
-
SKH FRC - The Makeover
Finally a layout was approved and a go-ahead for fabrication.
-
Fabrication & Quality
After powder coating, each bay of the Kwike console is assembled ...
-
Fabrication & Quality
and check for aligment.
-
Fabrication & Quality
When all the individual bay are checked ...
-
Fabrication & Quality
all the console bays are assembled to actual layout for table top fabrication.
-
Fabrication & Quality
45 Degree table top fabrication is most challenging to make.
-
Fabrication & Quality
Final Insection of the full console before packing for delivery.
-
Fabrication & Quality
Final Insection for table top joints.
-
Fabrication & Quality
Final Insection on table top.
-
Kwike Console installation
Migration of workstations were planned to be in phases, starting from left wing of the Kwike console
-
Kwike Console installation
Workstations migrated into left wing of the Kwike console
Raised floor board were cut for cable entry, SOB relocated for nearest running route.
-
Kwike Console installation
Coordination with respective system owners were critical to minimise downtime ...
-
Kwike Console installation
and disruption to FRC operation
-
Kwike Console installation
Migration of workstations from Medical Gas, PWCS, PTS, CCTV, EFIRMs, Fire system into right wing of the Kwike console
to clear tables and make way for center wing console.
-
Kwike Console installation
Halfway through, hit a niche on the lift system which is very sensitive, migration was put to hiatus and re-scheduled.
-
Kwike Console installation
Swisslog came in to assist on the migration of the AGV system, including the UPS and servers moved and mounted neatly in the console.
-
Kwike Console installation
SOB were also relocated near the console for easy service and maintenance.
-
Kwike Console installation
After the AGV and Lift system moved into the respective consoles, making way for the center wing to move in and migrate IBMS into the console.
-
Kwike Console installation
In phases, all workstations are successfully migrated into the console.
-
Kwike Console installation
Finally, Kwike Console taking shape and workstations going into full operation.
-
Kwike Console installation
FRC was back to normal operation, with a brand new look.
-
Kwike Console installation
Every personnel are happy to settle in their own workspace comfortably.
-
CLEVER Video Wall installation
CLEVER Network switches and cabling laid prior to Video Wall installation.
Linking all the workstations in the CLEVER Net
-
CLEVER Video Wall installation
At the begining of CLEVER Video Wall installation
the space was cleared for the commencement of video wall installation.
-
CLEVER Video Wall installation
Briefing for installation team to clear all under raise floor obstacles
-
CLEVER Video Wall installation
Center structure move in to position ...
-
CLEVER Video Wall installation
into the raised floor ...
-
CLEVER Video Wall installation
and bolted onto concrete floor.
-
CLEVER Video Wall installation
After video wall structure bolted to the floor, raise floor tile support adjusted to levelling height
-
CLEVER Video Wall installation
Next, Right structure into place
-
CLEVER Video Wall installation
Then, Left structure, which complete the video wall structure
-
CLEVER Video Wall installation
High quality hydraulic assisted pop-out brackets with 6-axis adjustment and lock position catch are installed for easy LCD servicing ...
-
CLEVER Video Wall installation
Installation and levelling of center LCD
-
CLEVER Video Wall installation
Ensuring LCD is levelled vertically and horizontally so as to have a seamless video wall.
Meanwhile, CLEVER controller is also configured to cast critical workstations at the default slots.
-
CLEVER Video Wall installation
Signal are fed from CLEVER Controller to video wall enable ScreenCast of remote workstations in the CLEVER Network
-
CLEVER Video Wall installation
Next LCD installed and signal test from CLEVER Controller
-
CLEVER Video Wall installation
Third LCD complete center row Video wall installation
-
CLEVER Video Wall installation
Finally all 9 LCDs are installed and looped in a daisy chain with single 4K HDMI input to form a 3x3 video wall
-
CLEVER Video Wall installation
Work station with ScreenCast are installed in workstations to enable projecting screen sharing on video wall
-
CLEVER Video Wall