FRC Makeover with migration of workstations and CLEVER Video Wall
 
  • SengKang Hospital - Facility Resource Center

    At the begining, FRC was using tables as work desk.

    Wires running all over the floor and desk making it displeasing and inconducive environment to work.

    A promised console was long overdue ...

  • SengKang Hospital - Facility Resource Center

    Workstations were placed on the table top, leaving no space for writing.

    Some monitors were stacked on top of tower CPU, making it very uncomfortable working posture.

  • SengKang Hospital - Facility Resource Center

    Wires running all over the floor and desk making it displeasing and inconducive environment to work.

  • SengKang Hospital - Facility Resource Center

    Maintenance and troubleshooting when equipments break down was quite a challenging work.

  • SengKang Hospital - Facility Resource Center

    Cablings may get damaged by operators working at the desk.

  • SengKang Hospital - Facility Resource Center

    A promised console was long overdue ...

  • SKH FRC - The Makeover

    A migration plan was meticulously drafted for FRC makeover

  • SKH FRC - The Makeover

    Numerous plans and design were drafted and countless drawing submitted ...

  • SKH FRC - The Makeover

    Finally a layout was approved and a go-ahead for fabrication.

  • Fabrication & Quality

    After powder coating, each bay of the Kwike console is assembled ...

  • Fabrication & Quality

    and check for aligment.

  • Fabrication & Quality

    When all the individual bay are checked ...

  • Fabrication & Quality

    all the console bays are assembled to actual layout for table top fabrication.

  • Fabrication & Quality

    45 Degree table top fabrication is most challenging to make.

  • Fabrication & Quality

    Final Insection of the full console before packing for delivery.

  • Fabrication & Quality

    Final Insection for table top joints.

  • Fabrication & Quality

    Final Insection on table top.

  • Kwike Console installation

    Migration of workstations were planned to be in phases, starting from left wing of the Kwike console

  • Kwike Console installation

    Workstations migrated into left wing of the Kwike console

    Raised floor board were cut for cable entry, SOB relocated for nearest running route.

  • Kwike Console installation

    Coordination with respective system owners were critical to minimise downtime ...

  • Kwike Console installation

    and disruption to FRC operation

  • Kwike Console installation

    Migration of workstations from Medical Gas, PWCS, PTS, CCTV, EFIRMs, Fire system into right wing of the Kwike console

    to clear tables and make way for center wing console.

  • Kwike Console installation

    Halfway through, hit a niche on the lift system which is very sensitive, migration was put to hiatus and re-scheduled.

  • Kwike Console installation

    Swisslog came in to assist on the migration of the AGV system, including the UPS and servers moved and mounted neatly in the console.

  • Kwike Console installation

    SOB were also relocated near the console for easy service and maintenance.

  • Kwike Console installation

    After the AGV and Lift system moved into the respective consoles, making way for the center wing to move in and migrate IBMS into the console.

  • Kwike Console installation

    In phases, all workstations are successfully migrated into the console.

  • Kwike Console installation

    Finally, Kwike Console taking shape and workstations going into full operation.

  • Kwike Console installation

    FRC was back to normal operation, with a brand new look.

  • Kwike Console installation

    Every personnel are happy to settle in their own workspace comfortably.

  • CLEVER Video Wall installation

    CLEVER Network switches and cabling laid prior to Video Wall installation.

    Linking all the workstations in the CLEVER Net

  • CLEVER Video Wall installation

    At the begining of CLEVER Video Wall installation

    the space was cleared for the commencement of video wall installation.

  • CLEVER Video Wall installation

    Briefing for installation team to clear all under raise floor obstacles

  • CLEVER Video Wall installation

    Center structure move in to position ...

  • CLEVER Video Wall installation

    into the raised floor ...

  • CLEVER Video Wall installation

    and bolted onto concrete floor.

  • CLEVER Video Wall installation

    After video wall structure bolted to the floor, raise floor tile support adjusted to levelling height

  • CLEVER Video Wall installation

    Next, Right structure into place

  • CLEVER Video Wall installation

    Then, Left structure, which complete the video wall structure

  • CLEVER Video Wall installation

    High quality hydraulic assisted pop-out brackets with 6-axis adjustment and lock position catch are installed for easy LCD servicing ...

  • CLEVER Video Wall installation

    Installation and levelling of center LCD

  • CLEVER Video Wall installation

    Ensuring LCD is levelled vertically and horizontally so as to have a seamless video wall.

    Meanwhile, CLEVER controller is also configured to cast critical workstations at the default slots.

  • CLEVER Video Wall installation

    Signal are fed from CLEVER Controller to video wall enable ScreenCast of remote workstations in the CLEVER Network

  • CLEVER Video Wall installation

    Next LCD installed and signal test from CLEVER Controller

  • CLEVER Video Wall installation

    Third LCD complete center row Video wall installation

  • CLEVER Video Wall installation

    Finally all 9 LCDs are installed and looped in a daisy chain with single 4K HDMI input to form a 3x3 video wall

  • CLEVER Video Wall installation

    Work station with ScreenCast are installed in workstations to enable projecting screen sharing on video wall

  • CLEVER Video Wall

    Another prestigious project by Closed-loop Technology